Result severity: Moderate to Severe
ROAD CLOSED; AND DETOURED FOR ROAD REHABILITATION UNTIL DECEMBER 2008 ESSEX COUNTY ; SEEK ALTERNATE.
Direction: N/A | Updated: Sat Aug 16, 3:17 pm (EDT)
Result severity: Moderate to Severe
ALL TWO LANES FROM THE NORTHBOUND VAN WYCK EXPRESSWAY RAMP TO THE NORTHBOUND WHITESTONE EXPRESSWAY WILL SHIFT TO THE RIGHT ONTO NEWLY CONSTRUCTED BRIDGE DECK. ONE LANE MAY BE CLOSED ON THE WHITESTONE EXPRESSWAY, AS NEEDED, IN EACH DIRECTION FROM 10AM TO 3PM WEEKDAYS; 10PM TO 5AM MONDAY NIGHTS TO FRIDAY MORNINGS; 10PM FRIDAY TO 6AM SATURDAY AND 10PM SATURDAY TO 11AM SUNDAY. TWO LANES IN EACH DIRECTION MAY BE CLOSED 1AM TO 5AM TUESDAY TO FRIDAY; 1AM TO 6AM SATURDAY, AND 2AM TO 9AM SUNDAY TO FACILITATE NYSDOT RECONSTRUCTION ACTIVITY THROUGH MID SEPTEMBER 2008.
Direction: N/A | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Moderate to Severe
THIS STREET IS CLOSED UNTIL LATE MARCH 2009 TO FACILITATE NYCDDC WATER MAIN AND ROADWAY RECONSTRUCTION WORK
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
ROAD CLOSED; FOR THE MULBERRY STREET PEDESTRIAN MALL FROM 11AM TO 6PM, UNTIL SEPTEMBER 7TH NO BUSES AFFECTED ; SEEK ALTERNATE.
Direction: N/A | Updated: Sat Aug 16, 3:17 pm (EDT)
Result severity: Moderate to Severe
ONE LANE MAY BE CLOSED ON THE ABOVE ROADWAYS NORTHBOUND TOWARDS THE BROOKLYN BATTERY TUNNEL FROM 10AM TO 3PM WEEKDAYS. ONE LANE MAY BE CLOSED ON THE ABOVE ROADWAYS SOUTHBOUND TOWARDS THE VERRAZANO NARROWS BRIDGE FROM 7AM TO 3PM WEEKDAYS TO FACILITATE NYSDOT LONG TERM WORK.
Direction: N/A | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Moderate to Severe
ONE LANE MAY BE CLOSED ON THE ABOVE ROADWAYS NORTHBOUND TOWARDS THE BROOKLYN BATTERY TUNNEL FROM 10AM TO 3PM WEEKDAYS. ONE LANE MAY BE CLOSED ON THE ABOVE ROADWAYS SOUTHBOUND TOWARDS THE VERRAZANO NARROWS BRIDGE FROM 7AM TO 3PM WEEKDAYS TO FACILITATE NYSDOT LONG TERM WORK.
Direction: N/A | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Moderate to Severe
ONE LANE MAY BE CLOSED SOUTHBOUND FROM 10AM TO 3PM, 10PM TO 5AM WEEKDAYS, AND 10PM FRIDAY TO 7AM SATURDAY, 11PM SATURDAY TO 2PM SUNDAY TO FACILITATE NYC PARKS DEPARTMENT REPAIRS.
Direction: Southbound | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
THIS STREET IS CLOSED UNTIL SPRING 2009 TO FACILITATE NYCDOT WATER MAIN WORK.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
THIS ROADWAY WAS CLOSED AS OF MARCH 19, 2005, FOR FOUR YEARS, TO FACILITATE NYCDEP PUMPING STATION CAPITAL PROJECT.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
LANES HAVE BEEN REOPENED ON THE GRAND CONCOURSE. ONE LANE IN EACH DIRECTION IS SUBJECT TO CLOSURE FOR PUNCH LIST WORK ACTIVITY. ONE LANE IS MAINTAINED IN EACH DIRECTION ON EAST 161ST STREET BETWEEN GRAND CONCOURSE AND SHERIDAN AVENUE. THE NORTH SIDEWALK IN THE EAST 161ST STREET UNDERPASS IS CLOSED. THIS WORK IS SCHEDULED UNTIL THE END OF SEPTEMBER 2008.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
ONE LANE MAY BE CLOSED NORTHBOUND TO THE BRONX NOON TO 3PM MONDAY, 10AM TO 3PM MONDAY TO THURSDAY, AND 10AM TO 2:30PM FRIDAY, AND 6AM TO NOON SATURDAY AND SUNDAY. ONE LANE MAY BE CLOSED SOUTHBOUND TO QUEENS 10AM TO 3PM MONDAY TO THURSDAY, AND 10AM TO 2:30PM FRIDAY, 6AM TO NOON SATURDAY AND SUNDAY. TWO OF FOUR LANES MAY BE CLOSED QUEENS BOUND MONDAY NIGHT TO FRIDAY MORNINGS FROM 10PM TO 6AM, AND 11PM TO 6AM FRIDAY AND SATURDAY NIGHTS. ONE LANE IN EACH DIRECTION MAY BE CLOSED SATURDAY AND SUNDAY FROM 6AM TO 11:59AM TO FACILITATE MTA DECK REPLACEMENT WORK.
Direction: Southbound | Updated: Fri Aug 29, 6:04 am (EDT)
Result severity: Moderate to Severe
THIS BRIDGE WAS CLOSED JANUARY 23, 2008. MOTORISTS AND BICYCLIST SHOULD USE ALTERNATE ROUTE OR FOLLOW POSTED DETOUR. PEDESTRIANS MUST USE THE ADJACENT 6TH AVENUE BRIDGE, OR VANDERBILT AVENUE. THIS IS A LONG TERM PROJECT TO UPGRADE THE LIRR YARD AND CONSTRUCT A NEW BRIDGE. THIS WORK IS BEING PERFORMED BY A PRIVATE DEVELOPER CONTRACTOR AND SCHEDULED FOR COMPLETION JANUARY 2010.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
ONE LANE MAY BE CLOSED ON THE ABOVE ROADWAYS NORTHBOUND TOWARDS THE BROOKLYN BATTERY TUNNEL FROM 10AM TO 3PM WEEKDAYS. ONE LANE MAY BE CLOSED ON THE ABOVE ROADWAYS SOUTHBOUND TOWARDS THE VERRAZANO NARROWS BRIDGE FROM 7AM TO 3PM WEEKDAYS TO FACILITATE NYSDOT LONG TERM WORK.
Direction: N/A | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Moderate to Severe
ONE LANE MAY BE CLOSED NORTHBOUND TO THE BRONX NOON TO 3PM MONDAY, 10AM TO 3PM MONDAY TO THURSDAY, AND 10AM TO 2:30PM FRIDAY, AND 6AM TO NOON SATURDAY AND SUNDAY. ONE LANE MAY BE CLOSED SOUTHBOUND TO QUEENS 10AM TO 3PM MONDAY TO THURSDAY, AND 10AM TO 2:30PM FRIDAY, 6AM TO NOON SATURDAY AND SUNDAY. TWO OF FOUR LANES MAY BE CLOSED QUEENS BOUND MONDAY NIGHT TO FRIDAY MORNINGS FROM 10PM TO 6AM, AND 11PM TO 6AM FRIDAY AND SATURDAY NIGHTS. ONE LANE IN EACH DIRECTION MAY BE CLOSED SATURDAY AND SUNDAY FROM 6AM TO 11:59AM TO FACILITATE MTA DECK REPLACEMENT WORK.
Direction: Northbound | Updated: Fri Aug 29, 6:04 am (EDT)
Result severity: Moderate to Severe
ONE LANE IN EACH DIRECTION MAY BE CLOSED WEEKDAYS MONDAY TO FRIDAY FOR CONSTRUCTION NORTHBOUND TOWARD BROOKLYN 9AM TO 4PM AND SOUTHBOUND TO THE ROCKAWAYS 7AM TO 3PM TO FACILITATE MTA CONSTRUCTION ACTIVITY.
Direction: Northbound | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Moderate to Severe
ONE LANE MAY BE CLOSED NORTHBOUND TO THE BRONX OFF PEAK HOURS 10AM TO 3PM MONDAY TO THURSDAY, AND 10AM TO 2:30PM FRIDAY. TWO OF FOUR LANES MAY BE CLOSED 11PM TO 5AM MONDAY TO THURSDAY AND 12:01AM TO 5AM FRIDAY. ONE OF FOUR LANES MAY BE CLOSED TO QUEENS 9:30AM TO 2:30PM MONDAY TO FRIDAY. TWO OF FOUR LANES MAY BE CLOSED TO QUEENS 11PM TO 5AM MONDAY TO THURSDAY TO FACILITATE MTA BRIDGE CONSTRUCTION.
Direction: Northbound | Updated: Fri Aug 29, 6:04 am (EDT)
Result severity: Moderate to Severe
ROAD CLOSED; FOR THE FRIENDS OF DAG HAMMARRSKJOLD PLAZA STREET FAIR SATURDAY AUG; 30TH BETWEEN 11 A.M; TO 6 P.M; WATCH FOR POSSIBLE DELAYS OR DIVERSIONS ON THE M15, M27, M31, M50 M57 BUSES ; SEEK ALTERNATE.
Direction: N/A | Updated: Fri Aug 29, 9:58 am (EDT)
Result severity: Moderate to Severe
THIS ROADWAY MAY BE CLOSED 8PM TO 5AM WEEKNIGHTS UNTIL THE END OF NOVEMBER 2008 TO FACILITATE NYCDDC ROADWAY AND PRECINCT BUILDING CONSTRUCTION ACTIVITY.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
THIS ROADWAY IS CLOSED UNTIL THE END OF AUGUST 2008 TO FACILITATE NYSDOT ROADWAY CONSTRUCTION. MOTORISTS SHOULD FOLLOW POSTED DETOUR.
Direction: Westbound | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
THESE BRIDGES WERE CLOSED AS OF MAY 31, 2005 UNTIL THE END OF DECEMBER 2008 IN ORDER TO FACILITATE NYSDOT ROADWAY RECONSTRUCTION WORK.
Direction: N/A | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Moderate to Severe
THIS RAMP IS CLOSED FROM OCTOBER 18TH, 2006 THROUGH AUGUST 2008 TO FACILITATE NYSDOT ROADWAY RECONSTRUCTION. MOTORISTS WILL BE DETOURED TO 69TH STREET AND SHOULD FOLLOW POSTED DETOUR.
Direction: Westbound | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
THIS ROADWAY WAS CLOSED AS OF DECEMBER 4TH, 2006 UNTIL MARCH 27, 2008 TO FACILITATE LONG TERM NEW BUILDING AND ROADWAY RECONSTRUCTION FOR THE BRONX TERMINAL MARKET. EFFECTIVE MARCH 28TH, 2008 ONE LANE IN EACH DIRECTION REOPENED TO TRAFFIC, WHILE THE EASTERN HALF OF THE ROADWAY REMAINS UNDER CONSTRUCTION UNTIL APRIL 2009.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate to Severe
ONE OF THREE SOUTHBOUND LANES MAY BE CLOSED AS NEEDED 10AM TO 3PM AND 10PM TO 6AM WEEKDAYS, 10PM FRIDAY TO 7AM SATURDAY, AND 10PM SATURDAY TO 10AM SUNDAY. TWO OF THREE SOUTHBOUND LANES MAY BE CLOSED 12:01AM TO 5AM TUESDAY TO FRIDAY, 1AM TO 6AM SATURDAY AND 2AM TO 9AM SUNDAY TO FACILITATE NYC PARKS DEPARTMENT WORK UNTIL APRIL 2009.
Direction: Southbound | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Moderate to Severe
ONE LANE IN EACH DIRECTION MAY BE CLOSED WEEKDAYS MONDAY TO FRIDAY FOR CONSTRUCTION NORTHBOUND TOWARD BROOKLYN 9AM TO 4PM AND SOUTHBOUND TO THE ROCKAWAYS 7AM TO 3PM TO FACILITATE MTA CONSTRUCTION ACTIVITY.
Direction: Southbound | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Moderate to Severe
ROAD CLOSED; WILL BE TORN DOWN AND REBUILT STARTING IN SEPTEMBER AND FINISHED BY 2010 LIRR COMMUTERS ARE ADVISED TO PARK IN THE SOUTHWEST LOT AT THE BROADWAY MALL OR AT SEARS.SHUTTLE SERVICE WILL BE PROVIDED DURING RUSH HOURS WEEKDAYS BY THE TOWN OF OYSTER BAY; SEEK ALTERNATE.
Direction: N/A | Updated: Sat Aug 16, 3:17 pm (EDT)
Result severity: Moderate
LONG TERM ROAD CONSTRUCTION, CLOSED FOR REPAIRS, ENTRANCE RAMP CLOSED ON I 278 EASTBOUND AT EXIT 37 ROOSEVELT AVENUE BROADWAY UNTIL 11:45 PM, 12 31 09
Direction: Eastbound | Updated: Mon Mar 24, 10:33 am (EDT)
Result severity: Moderate
ONE LANE OF TRAFFIC WILL BE MAINTAINED AT ALL TIMES FROM JANUARY 3 TO LATE NOVEMBER 2008. THREE LANES ARE MAINTAINED ON VARICK STREET AT THE INTERSECTION WITH HOUSTON STREET FROM 10PM TO 6AM AND FULL WIDTH REOPENED TO TRAFFIC NON WORKING HOURS. THIS WORK WILL CONTINUE TO LATE NOVEMBER 2008 AND IS RELATED TO LONG TERM NYCDDC RECONSTRUCTION.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Moderate
SCHEDULED WORK CREW; ON THE LILY POND AVE OVERPASS WHICH WILL HAVE A LANE SHIFT.NO LANES WILL BE CLOSED; THIS IS PHASE 3 OF THE LILY POND AVE OVERPASS PROJECT AND IS EXPECTED TO RUN UNTIL SEPTEMBER 2009.
Direction: Eastbound | Updated: Sat Aug 16, 3:17 pm (EDT)
Result severity: Moderate
ROAD CONSTRUCTION, EXIT RAMP CLOSED ON GRAND CENTRAL PARKWAY EASTBOUND AT EXIT 7 LAGUARDIA AIRPORT STARTING 10:00 PM, 06 19 08 UNTIL 4:00 AM, 08 31 08COMMENT: MOTORIST SHOULD USE EXIT 6 94TH STREET TO ACCESS THE AIRPORT DURING THESE HOURS.
Direction: Eastbound | Updated: Tue Aug 12, 5:43 am (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON NY 109 IN BOTH DIRECTIONS FROM MAIN STREET TO SOUTHERN STATE PARKWAY EFFECTIVE DATES : STARTING ON 07 14 08 11:11 AM UNTIL FURTHER NOTICECOMMENT: TWO LANES MAY BE CLOSED IN FARMINGDALE.
Direction: N/A | Updated: Fri Aug 29, 1:05 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON NY 110 NORTHBOUND FROM SOUTHERN STATE PARKWAY TO ROUTE 109 EFFECTIVE DATES : STARTING ON 04 18 08 08:03 AM UNTIL FURTHER NOTICECOMMENT: TWO LANES MAY BE CLOSED IN FARMINGDALE.
Direction: Northbound | Updated: Fri Aug 29, 1:05 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON NY 27 EASTBOUND FROM ROUTE 135 TO ROUTE 109 EFFECTIVE DATES : STARTING ON 08 25 08 07:37 AM UNTIL FURTHER NOTICECOMMENT: ONE LANE MAY BE CLOSED FOR MOBILE WORK.
Direction: Eastbound | Updated: Fri Aug 29, 8:05 am (EDT)
Result severity: Minor to Moderate
SCHEDULED WORK CREW; BETWEEN JONES BEACH TOLL BOOTHS AND SOUTH OF EXISTING SLOOP CHANNEL BRIDGE BLOCKS RIGHT LANE 24 HRS.
Direction: Southbound | Updated: Sat Aug 16, 3:17 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON NY 106 SOUTHBOUND FROM ROUTE 24 TO OLD COUNTRY ROAD EFFECTIVE DATES : STARTING ON 07 07 08 07:09 AM UNTIL FURTHER NOTICECOMMENT: ONE LANE MAY BE CLOSED IN LEVITTOWN.
Direction: Southbound | Updated: Fri Aug 29, 8:05 am (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON WANTAGH STATE PARKWAY SOUTHBOUND FROM BRUSH HOLLOW ROAD TO SOUTHERN STATE PARKWAY EFFECTIVE DATES : STARTING ON 08 25 08 07:34 AM UNTIL FURTHER NOTICECOMMENT: ONE LANE MAY BE CLOSED IN WANTAGH AND WESTBURY.
Direction: Southbound | Updated: Fri Aug 29, 8:05 am (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON MEADOWBROOK STATE PARKWAY IN BOTH DIRECTIONS FROM ROUTE 24 TO OLD COUNTRY ROAD EFFECTIVE DATES : STARTING ON 08 18 08 06:54 AM UNTIL FURTHER NOTICECOMMENT: TWO LANES MAY BE CLOSED IN UNIONDALE.
Direction: N/A | Updated: Fri Aug 29, 8:05 am (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON NY 25B IN BOTH DIRECTIONS AT ROUTE 25 EFFECTIVE DATES : STARTING ON 08 04 08 06:40 AM UNTIL FURTHER NOTICECOMMENT: TWO LANES MAY BE CLOSED.
Direction: N/A | Updated: Fri Aug 29, 7:05 am (EDT)
Result severity: Minor to Moderate
VAN BRUNT STREET IS ONE WAY SOUTHBOUND BETWEEN DEGRAW STREET AND HAMILTON AVENUE IN ORDER TO FACILITATE ROADWAY RECONSTRUCTION ALONG VAN BRUNT STREET UNTIL NOVEMBER 2008. ONE LANE IN EACH DIRECTION ON COLUMBIA STREET IS MAINTAINED BETWEEN CONGRESS STREET AND THE BQE RAMP AND TWO LANES SOUTHBOUND AND ONE LANE NORTHBOUND BETWEEN THE BQE RAMP AND ATLANTIC AVENUE UNTIL THE END OF AUGUST 2008. THIS WORK IS NECESSARY TO FACILITATE NYCDDC ROADWAY RECONSTRUCTION.
Direction: N/A | Updated: Sat Aug 30, 12:04 am (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON NY 110 SOUTHBOUND FROM ROUTE 24 TO ROUTE 109 EFFECTIVE DATES : STARTING ON 05 23 08 12:05 PM UNTIL FURTHER NOTICECOMMENT: TWO LANES MAY BE CLOSED IN FARMINGDALE.
Direction: Southbound | Updated: Fri Aug 29, 1:05 pm (EDT)
Result severity: Minor to Moderate
THIS STREET WILL BE CLOSED MARCH 1, 2008 TO SPRING 2009 TO FACILITATE NYCDDC WATER MAIN AND ROADWAY RECONSTRUCTION.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON SOUTHERN STATE PARKWAY IN BOTH DIRECTIONS FROM NEW YORK CITY LINE TO NASSAU ROAD EFFECTIVE DATES : STARTING ON 08 25 08 07:23 AM UNTIL FURTHER NOTICECOMMENT: TWO LANES MAY BE CLOSED IN VALLEY STREAM AND HEMPSTEAD.
Direction: N/A | Updated: Fri Aug 29, 8:05 am (EDT)
Result severity: Minor to Moderate
THIS STREET HAS ONE LANE MAINTAINED UNTIL FURTHER NOTICE, TO FACILITATE NYCDDC SEWER REPLACEMENT.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON NY 27 EASTBOUND FROM NASSAU QUEENS COUNTY LINE TO ROUTE 109 EFFECTIVE DATES : STARTING ON 08 11 08 07:01 AM UNTIL FURTHER NOTICECOMMENT: ONE LANE MAY BE CLOSED FROM NYC LINE TO ROUTE 109 FOR MOBILE WORK.
Direction: Eastbound | Updated: Fri Aug 29, 8:05 am (EDT)
Result severity: Minor to Moderate
AS OF JULY 23 LONG TERM WATER MAIN AND ROADWAY WORK WILL OCCUR BY NYCDDC CONTRACTOR WHILE MAINTAINING TWO LANES OF TRAFFIC ON CHURCH STREET.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Minor to Moderate
LONG TERM ROAD CONSTRUCTION, REDUCED TO TWO LANES ON BELT SYSTEM CROSS ISLAND PARKWAY IN BOTH DIRECTIONS AT UTOPIA PARKWAY UNTIL 2:30 PM, 12 31 08
Direction: N/A | Updated: Fri Apr 25, 7:22 am (EDT)
Result severity: Minor to Moderate
LONG TERM ROAD CONSTRUCTION, RIGHT LANE CLOSED, LEFT LANE CLOSED ON JACKIE ROBINSON PARKWAY IN BOTH DIRECTIONS AT I 678; GRAND CENTRAL PARKWAY EFFECTIVE DATES : STARTING ON 02 11 08 08:22 AM UNTIL FURTHER NOTICECOMMENT: RAMP TO UNION TURNPIKE.
Direction: N/A | Updated: Fri Aug 29, 6:05 pm (EDT)
Result severity: Minor to Moderate
DELAYS ON I 495 WESTBOUND FROM EXIT 23 MAIN STREET TO EXIT 19 WOODHAVEN BOULEVARD ROUTE 25 QUEENS BOULEVARD EFFECTIVE DATES : STARTING ON 08 29 08 06:23 AM UNTIL FURTHER NOTICE
Direction: Westbound | Updated: Sat Aug 30, 5:55 am (EDT)
Result severity: Minor to Moderate
CONSTRUCTION WORK ON GRAND CENTRAL PARKWAY EASTBOUND FROM EXIT 13 I 678 SOUTH INTERBORO; VAN WYCK EXPRESWAY TO EXIT 23 CROSS ISLAND PARKWAY WINCHESTER AVENUE EFFECTIVE DATES : STARTING ON 08 15 08 09:18 AM UNTIL FURTHER NOTICE
Direction: Eastbound | Updated: Fri Aug 29, 12:05 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON SOUTHERN STATE PARKWAY WESTBOUND FROM ROUTE 109 FARMNDAL TO ROUTE 135 EFFECTIVE DATES : STARTING ON 07 28 08 11:02 AM UNTIL FURTHER NOTICECOMMENT: ALL LANES MAY BE CLOSED.
Direction: Westbound | Updated: Fri Aug 29, 1:05 pm (EDT)
Result severity: Minor to Moderate
LONG TERM ROAD CONSTRUCTION ON I 678 NORTHBOUND AT WHITESTONE EXPRESSWAY UNTIL 3:00 PM, 12 31 08COMMENT: TWO LANES CLOSED AFTER 1:00AM. THESE CLOSURES ARE TO FACILITATE NYSDOT RECONSTRUCTION ACTIVITY.
Direction: Northbound | Updated: Fri Apr 25, 7:22 am (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION, REDUCED TO ONE LANE ON BELT SYSTEM SHORE PARKWAY EASTBOUND AT CROSS BAY BOULEVARD UNTIL 5:00 AM, 08 31 08
Direction: Eastbound | Updated: Fri Aug 15, 2:43 pm (EDT)
Result severity: Minor to Moderate
CONSTRUCTION WORK ON GRAND CENTRAL PARKWAY EASTBOUND AT NORTHERN BOULEVARD EFFECTIVE DATES : STARTING ON 08 22 08 08:20 AM UNTIL FURTHER NOTICE
Direction: Eastbound | Updated: Fri Aug 29, 9:05 am (EDT)
Result severity: Minor to Moderate
SCHEDULED WORK CREW; NEW TRAFFIC PATTERN IN EFFECT MOTORISTS PROHIBITED FROM MAKING LEFT TURNS FROM THE NEWARK BAY EXTENSION ONTO JERSEY AVENUE NO RIGHT TURNS FROM 139 TO JERSEY AVENUE.
Direction: Eastbound | Updated: Sat Aug 16, 3:17 pm (EDT)
Result severity: Minor to Moderate
LONG TERM ROAD CONSTRUCTION ON HENRY HUDSON PARKWAY SOUTHBOUND FROM 95TH STREET EXIT TO 79TH STREET EXIT UNTIL 3:00 PM, 04 30 09COMMENT: TWO LANES CLOSED AFTER 1:00AM. THIS IS TO FACILITATE NYC PARKS DEPARTMENT WORK.
Direction: Southbound | Updated: Tue Apr 29, 1:21 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION, LEFT LANE CLOSED ON I 495 IN BOTH DIRECTIONS AT EXIT 19 WOODHAVEN BOULEVARD ROUTE 25 QUEENS BOULEVARD UNTIL 2:00 PM, 09 30 08
Direction: N/A | Updated: Tue Jun 17, 9:24 am (EDT)
Result severity: Minor to Moderate
WORK AT FREDERICK DOUGLAS CIRCLE, WHILE MAINTAINING 3 LANES WITHIN THE CIRCLE, WILL CONTINUE THROUGH JANUARY 2009 TO FACILITATE NYCDDC ROADWAY RECONSTRUCTION.
Direction: N/A | Updated: Fri Aug 29, 6:04 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION, RIGHT LANE CLOSED ON NY 440 NORTHBOUND AT EXIT 8 SOUTH AVENUE EFFECTIVE DATES : STARTING ON 08 18 08 10:50 AM UNTIL FURTHER NOTICE
Direction: Northbound | Updated: Fri Aug 29, 1:05 pm (EDT)
Result severity: Minor to Moderate
ROAD CONSTRUCTION ON HARLEM RIVER DRIVE N